Plain-English advice for strata committees and owners: what is common property, how to approve work, and how to plan for it.

24/7 PRIORITY RESPONSE | WORK ORDERS | COMPLIANCE PACK

Google

Overall Rating

4.9

Five stars

(3,000+)

Brightest & Best Business Awards: Winner 2019, Winner 2024, Winner 2025, People's Choice 2025, Finalist 2023

NOW SERVICING NORTH SYDNEY

  • NSW Contractor Licence 285594C
  • 24/7 Priority Response
  • 5,183 Commercial Jobs Since 2019
  • Report and Photos on Every Job
  • Invoices With Your PO and SP Number
  • Onsite in 30 Minutes Guaranteed

THE SHORT ANSWER

In short

Proximity Plumbing helps NSW owners corporations and strata committees look after the plumbing that belongs to the whole building: shared drains, stacks, risers, hot water plant and stormwater. We explain what is common property, quote work so the committee can approve it, and give you a 10-Year Plumbing Plan for the capital works fund.

WE UNDERSTAND YOUR JOB

What committees tell us

Who pays for this?

A leak between two lots, a blocked stack, a burst pipe in a wall: is it the owners corporation or the lot owner? We tell you what we found and where it is.

Approving the right work

Committees need clear options and a fixed price, not jargon. Our quotes give the options, photos and what happens if you wait.

Budgeting for the big items

Stacks, hot water plant and main drains are expensive and fail without warning. The capital works fund needs real figures.

Reading the reports

Plumbing reports are full of terms most owners never use. Ours rate every asset green, amber or red, in plain English.

HOW WE WORK WITH YOU

How we work with your committee

1

Through your strata manager

Most work comes to us from your strata manager, who holds the approval limits the owners corporation sets.

2

A clear quote

Options, photos and a fixed price, ready to put to the committee or the AGM.

3

The work

Residents told in advance, water shutdowns kept short, a report with photos at the end.

4

The record

Every invoice carries your strata plan number, and every report goes on the building’s file.

COMMON PROPERTY

Common property or lot: who looks after the pipes

The owners corporation must repair and maintain common property and keep a 10-year capital works plan. NSW Government guidance puts plumbing in boundary walls and under the floor with the owners corporation, and plumbing in internal walls and fixtures with the lot owner (NSW Government). Your by-laws can change this, so check them with your strata manager.

When we find a fault, our report says where the pipe runs and what it serves, so the strata manager can decide who is responsible. See who pays for a plumbing emergency.

BEFORE AND AFTER

See the difference

Stacks and drains repaired from the inside. Drag the handle to compare.

Real job: cracked pipe

CCTV still inside the same drain after relining, showing the smooth linerCCTV still inside an old drain pipe with a cracked joint and loose debris

Illustration, not a Proximity job

CCTV stills from one of our relining jobs, 28 October 2026: the old pipe with a cracked joint and loose debris, then the finished liner, 3.84 metres in. A real Proximity job.

Cracked, displaced joint

The same pipe relined with a continuous linerCCTV view of a cracked pipe with a displaced joint

Illustration, not a Proximity job

A cracked pipe with a displaced joint, then a liner that bridges both with no digging. Illustration, not a Proximity job.

APPROVING WORK

Who can approve plumbing work, and what they need

Who can say yes depends on the size of the job and on your by-laws, which can set rules and a spending limit for major repairs. NSW Government guidance sets out the usual pattern (NSW Government):

The jobWho usually approves itWhat helps them decide
A minor repair, such as a dripping tap in a common laundry or a blocked common drainThe strata committee, the strata manager or the building manager, without a meetingA fixed price and photos, within the limit the owners corporation has delegated
An emergency, such as a burst pipe or a sewer overflowMade safe straight away; the permanent repair is approved afterwardsA make-safe report, then a quote for the permanent repair. Levies for emergency repairs can be called with at least 14 days’ notice
A major repair, such as replacing a collapsed section of sewer lineThe strata committee, and a committee meeting may be neededOptions with their pros and cons, photos or CCTV, and what happens if the work waits
Work valued at $30,000 or more, such as relining several stacksThe owners corporation, after at least two independent quotes; the rule applies to every scheme, whatever its size, but not to emergency repairsA scope written clearly enough for a second contractor to price exactly the same work
A repair an owner wants raisedA motion for the next general meetingA short plumbing report the motion can attach

Two quotes only help if they price the same thing. Ask both contractors to quote to one written scope: the same lengths of pipe, the same method, the same junctions reopened and the same make good. Otherwise the cheaper quote is often simply the smaller job. Our guide on approving plumbing work quickly has a template.

CAPITAL WORKS FUND

Putting the plumbing into the 10-year plan

The capital works fund plan predicts the major repairs the building will need and forecasts what they will cost, and new and revised plans must use the standard form. NSW Fair Trading’s capital works fund planner helps a committee build one, and the plan should be reviewed at least every five years, with a yearly review recommended (NSW Government).

Plumbing is easy to leave out because most of it is hidden. These are the items that belong in the plan:

  • Cast iron and early PVC stacks, and the junctions where each lot joins them
  • The main sewer line to the boundary, especially clay pipe under gardens and driveways
  • Stormwater lines, pits, box gutters and downpipes
  • Central hot water plant, its storage tanks and the flow and return pipework
  • Sewer and stormwater pumps, and their control panels and alarms
  • Water service pipes in older buildings, such as galvanised steel

These assets tend to fail slowly and then all at once. Across our strata jobs since 2019, 144 ended with a section of pipe dug up and replaced, and 130 with a pipe relined: work that is far easier to fund when the plan has already set money aside for it. Half of our 35 priced commercial and strata pipe relining jobs since 2019 cost between $4,235 and $11,676, including GST, with a median of $7,150.

READING THE REPORT

Plumbing words you will meet in a strata report

  • Stack. The vertical pipe that carries waste from every floor down to the main drain.
  • Junction. Where a lot’s branch pipe joins the stack or the drain, and a common place for leaks and blockages.
  • Riser. A vertical water or stormwater pipe running up through the building.
  • CCTV survey. A camera pushed along the drain and recorded on video, with each defect noted by its distance from the access point.
  • Inspection opening. A capped access point on a drain or stack, used to clear it and to put a camera in.
  • Relining. A new pipe formed inside the old one from a resin-soaked liner, without digging or opening walls.
  • Backflow prevention device. A valve assembly that stops water from the building flowing back into the drinking water main; testable devices are tested every year.
  • TMV. A thermostatic mixing valve, which blends hot and cold water to a safe temperature at the outlet.
  • Green, amber, red. Our condition ratings: good condition, plan for it, act now.

IF REPAIRS STALL

When an owner says common property is not being repaired

The owners corporation must repair and maintain common property under the Strata Schemes Management Act 2015. When an owner believes that is not happening, NSW Government guidance sets out the path:

  1. Put it in writing to the strata manager or the committee, with photos and any plumber’s report.
  2. Submit a motion to discuss the repair at the next general meeting.
  3. Apply to NSW Fair Trading for free mediation between the owner and the owners corporation.
  4. If mediation fails or is declined, lodge a formal complaint. Fair Trading may then seek a rectification plan, issue a compliance notice or seek enforceable undertakings.
  5. An owner may take legal action for losses caused by common property that was not repaired, within six years of becoming aware of the loss.

Source: NSW Government. Most of these disagreements turn on two facts: where the failed pipe is, and what caused it. A plumbing report that answers both, with photos, often settles the question at the first step.

SERVICES

The services you use most

BUILDING CARE

Planning for your capital works fund

Every owners corporation must have a 10-year plan for its capital works fund (same Act, s 80). Building Care starts with a free health check of the building’s plumbing and gives the committee a 10-Year Plumbing Plan: each asset, its condition, the year to act and a cost range. See a sample report.

CASE STUDY

From our job records

Strata · Strata block, Clovelly · March 2023

Cast iron stack replaced in a Clovelly strata block

The problem

Residents had constant blockages.

What we found

A CCTV camera showed the building’s cast iron stack was badly rusted and built up inside.

What we did

Jetting couldn’t clear it, so we replaced the stack with new PVC pipe. Residents were told in advance that water would be off for 2 to 4 hours.

Strata · 1970s block, more than 25 lots, Bellevue Hill · March 2023

Central hot water upgrade for a Bellevue Hill strata building

The problem

The building relied on two outdated hot water storage units that kept breaking down.

What we did

We replaced them with commercial-grade instantaneous gas heaters, a new storage tank and a flow and return system, then tested and commissioned it.

Outcome

Pressure, flow and temperature all improved, with lower running costs.

YOUR COMMERCIAL TEAM

Who looks after your account

One family business, one commercial team. Every enquiry is answered within 15 minutes, by people you can name.

QUESTIONS

Questions from owners corporations

GUIDES

Guides and next steps

COMMERCIAL & STRATA

Explore Commercial & Strata

OWNERS CORPORATIONS

Get the plumbing figures for your building

Book a free health check through your strata manager, or log a job if something needs fixing now.

Planning ahead? Request our compliance pack, book a free building health check or invite us to your contractor panel.

Licensed NSW 285594C

24/7 priority response

Report and photos on every job

4.9 from 3,000+ Google reviews