
Supplier & Compliance
Everything your procurement team needs to approve Proximity as a supplier.
24/7 PRIORITY RESPONSE | WORK ORDERS | COMPLIANCE PACK

NOW SERVICING NORTH SYDNEY
WE ARE AVAILABLE
- NSW Contractor Licence 285594C
- 24/7 Priority Response
- 5,183 Commercial Jobs Since 2019
- Report and Photos on Every Job
- Invoices With Your PO and SP Number
- Onsite in 30 Minutes Guaranteed
THE SHORT ANSWER
In short
Everything your procurement team needs to approve Proximity as a supplier: our licence, certificates of currency, WHS policy, sample SWMS and JSA, modern slavery statement, environmental policy, company details and capability statement, how we work on your site, and the prequalification platforms we join. Download the documents below, or request the certificates of currency and we reply within 15 minutes.
DOCUMENTS
Supplier documents
Current as of 8 November 2026. Each document shows its expiry date; an expired document comes off this page until the new one is uploaded. Certificates of currency come from our insurers and are emailed with the pack.
Contractor licence 285594C
Plumbing, drainage and gasfitting contractor licence, Building Commission NSW
Certificate of currency: public liability
$20 million public liability. Issued by our insurer and emailed with the compliance pack
Certificate of currency: workers compensation
Issued by our insurer and emailed with the compliance pack
WHS policy
Our work health and safety policy
Sample SWMS and JSA
A sample SWMS (roof work at height) and JSA (drain jetting and CCTV)
Modern slavery statement
Our voluntary statement on labour and suppliers
Environmental and waste policy
How we handle waste, wastewater and materials
ABN and company details
Legal entity, ACN, ABN, licence, address and account terms
Capability statement
Who we are, what we do and who we do it for
WHAT EACH DOCUMENT IS
What each document is, and why you need it
Contractor licence
A NSW contractor licence lets a business contract for plumbing, drainage and gasfitting work. Ours is 285594C. Do not rely on a copy: search the number on the NSW licence register to see the current status and classes, because a licence can lapse or be suspended after a PDF is sent.
Certificate of currency: public liability
A certificate of currency is the insurer’s confirmation that a policy is in force on the date it is issued. Check three things: the insured name matches the business you are engaging, the limit (ours is $20 million) meets your contract, and the expiry date is after the work will finish.
Certificate of currency: workers compensation
Workers compensation covers a contractor’s own workers if they are hurt on your site. icare warns principal contractors that they may be liable for fines if they incorrectly manage their subcontractors’ workers insurance (icare), so FM firms and builders ask for this certificate before work starts.
WHS policy
A short statement of how a business manages work health and safety: who is responsible, how hazards are found and controlled, and how incidents are reported. It tells you safety is managed as a system, not left to each plumber.
SWMS and JSA
A safe work method statement (SWMS) must be prepared before high risk construction work starts. It identifies the work, the hazards and risks, the controls, and how the controls are checked, and work must stop if it is not being done in line with it (SafeWork NSW). High risk construction work includes work where a person could fall more than 2 metres, work in or near a trench deeper than 1.5 metres or a confined space, work on or near pressurised gas mains or piping, work near energised electrical services and work likely to disturb asbestos (SafeWork NSW). For plumbing, that covers roof and box gutter work, deep drain excavations and many gas jobs. A job safety analysis (JSA) does the same step by step for lower-risk tasks, such as jetting a drain in an occupied building.
Modern slavery statement
The Commonwealth Modern Slavery Act requires entities with annual consolidated revenue of at least $100 million to report (Modern Slavery Register). Large clients must look at risks in their own supply chains, which include their contractors, so they ask suppliers like us. Ours is a voluntary statement: what we buy, where the risks are and what we do about them.
Environmental and waste policy
How a contractor keeps sewage, jetting water and debris out of stormwater, takes its waste away, recycles scrap metal and deals with spills. For a building, it means the drains you are paying to clear do not end up polluting the street or the harbour.
Company details and capability statement
The company details sheet gives accounts payable the legal entity, ACN, ABN, address and account terms to set us up as a supplier. The capability statement summarises who we are, what we do, who for, and our service levels, for the people deciding whether to add us to a panel.
PREQUALIFICATION
Contractor platforms
We are prequalified on Cm3. Most FM firms and developers onboard contractors through a prequalification platform such as Cm3, Rapid Global, Avetta or Aravo. Send us your organisation’s invitation and we complete the platform’s questionnaire, insurances and documents for you.
Already have an invitation? Add us on the contractor panel form and include the invitation link.
ON YOUR SITE
How we work on your site
Inductions
We complete your site induction before the first visit, online or on site, and keep the record for the next technician.
Sign in and sign out
Every technician signs in and out with building management or your visitor system, every visit.
Keys, fobs and access cards
Keys and fobs are signed out and returned the same day. Access details are kept against the building, so you only tell us once.
PPE and safe work
The right PPE for the task, a SWMS for high-risk work and a site risk check before work starts.
Isolations and permits
Water, gas and hot water isolations are planned with you, residents or tenants are told in advance, and hot work or roof permits are arranged first.
Occupied buildings
Floors protected, work areas kept tidy and noise kept to agreed hours, so residents and tenants can carry on.
Waste removal
Old pipe, fittings and packaging leave with us and are disposed of properly.
Incidents
Any incident or near miss is reported to you the same day, in writing.
WHS AND STRATA
Does your building need a contractor’s WHS documents?
It depends on how the building is used. SafeWork NSW says an owners corporation that is only responsible for common areas used for residential purposes is generally not a person conducting a business or undertaking for those areas, but WHS laws usually apply where common areas are used for a mix of residential and commercial purposes, and the position changes if the owners corporation employs a worker (SafeWork NSW).
Commercial and mixed-use owners corporations do carry real duties. In 2024 an owners corporation at an industrial complex was fined $225,000 after a damaged gate on common property fell and killed a worker; the court found that, as owner of the common property, it had the power and the obligation to make the site safe (SafeWork NSW).
Whatever the building, asking for the licence, insurance certificates and a SWMS for high risk work is sensible practice for a strata or facility manager. It shows the work was given to a competent, insured contractor, and it is the first thing an insurer or investigator asks for if something goes wrong.
CHECKLIST
A supplier onboarding checklist for managers
- Licence number checked on the NSW register, with the right classes for the work (plumbing, drainage, gasfitting)
- Public liability certificate of currency: insured name, limit and expiry date
- Workers compensation certificate of currency, current for the period of the work
- WHS policy on file, and a site-specific SWMS before any high risk construction work
- Site induction completed, and the building’s sign-in and key procedures explained
- Backflow testing accreditation if the contractor will test your devices: Sydney Water accepts tests only from accredited plumbers
- ABN, entity name and payment terms entered by accounts payable
- Bank details confirmed by phone with a number you already have, never from an email alone
- An expiry reminder set for each certificate, so the file does not quietly go out of date
For building managers: NSW building managers must now give written notice of any benefits when they suggest a contract, and promptly disclose connections with suppliers (NSW Government). A complete supplier file makes those disclosures easy to show.
INSURANCE WORK
Insurance and claims
When water damage leads to a claim, we make the building safe, find the cause and fix it, and give you a written report with photos that the insurer or loss assessor can use.
The report names the cause of damage, the work done, and anything still to fix. For strata, we note whether the source was common property or within a lot, so the claim goes to the right policy. See plumbing emergencies and insurance.
COMPLIANCE PACK
Request the full compliance pack
Every document above downloads straight away. For the certificates of currency, or to send the pack to your procurement team, tell us who you are and we email it.
What happens next
- We reply within 15 minutes and email the pack.
- Need a platform? Send the invitation and we complete it.
- Our Commercial Manager calls if you want to talk about your buildings.
Licence checks: search 285594C on the NSW licence register.
QUESTIONS
Compliance questions
EXPLORE
Related
COMMERCIAL & STRATA
Explore Commercial & Strata

SUPPLIER ONBOARDING
Add Proximity to your supplier list
Request the compliance pack, or log your first job today.
Licensed NSW 285594C
24/7 priority response
Report and photos on every job
4.9 from 3,000+ Google reviews

