How to approve plumbing fast: approval limits, emergency powers and committee-ready quotes
Minor strata repairs can be approved without a meeting and emergencies skip the two-quote rule. Set limits now and ask for quotes a committee can sign.
24/7 PRIORITY RESPONSE | WORK ORDERS | COMPLIANCE PACK

NOW SERVICING NORTH SYDNEY
WE ARE AVAILABLE
- NSW Contractor Licence 285594C
- 24/7 Priority Response
- 5,183 Commercial Jobs Since 2019
- Report and Photos on Every Job
- Invoices With Your PO and SP Number
- Onsite in 30 Minutes Guaranteed
KEY TAKEAWAYS
Quick answer
Reviewed by William Demirdonder, licensed plumber, NSW licence 275278C, on 8 November 2026
Quick answer
Minor repairs to common property can be managed by the strata committee, strata manager or building manager without a meeting, usually from the administrative fund. Emergency repairs such as burst or blocked water or sewer pipes do not need two quotes. For work valued at $30,000 or more, the owners corporation must get at least two independent quotes. Set a standing approval limit in advance and ask plumbers for quotes the committee can approve in one read.
- Agree a standing approval limit before you need it.
- Emergencies are exempt from the two-quote rule.
- Work valued at $30,000 or more needs at least two independent quotes.
- A committee-ready quote shows cause, options, price and access in one page.
GUIDE
What the NSW rules say
NSW Government strata guidance sets out three levels:
- Minor repairs to common property can be managed by the strata committee, strata manager or building manager without a meeting. They are usually paid from the administrative fund.
- Major repairs may need a strata committee meeting, for example to approve a contractor or costs above a spending limit. Check your by-laws for any spending limit. A job with both minor and major parts may need separate approvals.
- Larger jobs: for work valued at $30,000 or more, the owners corporation must obtain at least two independent quotes, whatever the size of the scheme. This does not apply to emergency repairs, such as burst or blocked water or sewerage pipes.
Before approving, the same guidance says to check the supplier is qualified or licensed, holds appropriate insurance and uses the right contract, and to look for unfair terms such as excessive charges for ending the agreement. Source: NSW Government, strata repairs and maintenance.
GUIDE
Set a standing limit before the next call
The slowest approvals happen when nobody knows who can say yes. Agree in advance, in line with your by-laws and management agreement, what the strata manager or building manager can approve alone.
Use real numbers. Half of our priced commercial and strata general plumbing jobs since 2019 cost between $332 and $1,162, and half of our blocked drain jobs cost between $424 and $1,440 (incl. GST). Across 217 strata plans since 2020, our median invoice was $990.
One way to set it out, to adapt to your own by-laws:
| Type of job | Who might approve | Typical limit to discuss |
|---|---|---|
| Emergency make-safe: water escaping, sewage, no water to the building | Strata or building manager, straight away | Enough to stop the damage and diagnose the cause |
| Urgent repair to one lot or one service | Strata manager, with a note to the committee | Around the cost of a typical repair in your building |
| Routine repairs and maintenance | Strata manager within the agreed limit | The same, with photos on the report |
| Planned or capital work | Committee or general meeting | Quoted, with two quotes at $30,000 or more |
Watch out
A limit set too low means every blocked drain waits for a committee email chain while the problem spreads. A limit that covers diagnosis and a make-safe lets the plumber stop damage, then quote the permanent fix.
GUIDE
Emergencies: make safe first, quote second
The emergency exemption exists so water can be stopped now. NSW Government guidance gives burst or blocked water or sewerage pipes, serious fire or storm damage, unexpected electrical or security failures, and broken glass affecting building security as examples.
For emergency repairs needed to address a serious and imminent threat to health or safety, levies can be raised with at least 14 days' notice to pay, rather than the usual 30 days.
A sensible split: authorise the make-safe straight away, then ask for a written quote for the permanent repair, which goes through your normal approval path. For a P1 emergency we are on site within 30 minutes, guaranteed, any hour, so the make-safe is rarely what holds a building up. The approval for the permanent fix is.
GUIDE
What a committee-ready quote looks like
Committees approve faster when the quote answers their questions before they ask. Look for:
- SP number, building address and the exact location (lot, level, riser, plant room).
- What was found and the likely cause, with photos.
- Whether the fault appears to sit in common property or in a lot.
- Options, such as repair now or plan the work for the capital works budget, with what each means for residents.
- A written scope and a fixed price including GST, and what is excluded.
- Access needed: lots to enter, water shutdowns, notice to residents.
- Timeframe, how long the price holds, licence number and insurance details.
A quote with all seven can usually be decided in one read. A quote missing the cause or the access plan almost always comes back with questions, and each round of questions costs days.
GUIDE
How committee decisions work
Knowing the meeting rules lets you plan the timing of a decision. NSW Government guidance on running strata meetings says (NSW Government, how to run a strata meeting):
- Owners must be notified of a strata committee meeting at least 3 days beforehand, with the date, time, place and an agenda.
- At least half of the committee must attend for the meeting to go ahead, and a resolution passes when more than 50% of committee members vote for it.
- Committees can vote in person, electronically or in writing. Pre-meeting electronic voting needs a committee resolution approving it first.
- A member with a financial interest must disclose it as soon as possible and stay out of that decision.
- Committees cannot make decisions reserved for the owners corporation, such as approving special levies.
- Minutes go to committee members and owners within seven days.
Practical upshot: if your committee has approved pre-meeting electronic voting, a clear quote can be voted on within days. If a special levy is needed, it has to go to a general meeting, so start early.
GUIDE
What slows approvals, and the fix
| What slows it | The fix |
|---|---|
| Nobody knows who can approve | Write the standing limit into the building's procedures and give it to your plumber. |
| The quote does not explain the cause | Ask for the finding, photos and the likely cause on the quote itself. |
| Committee members ask different questions by email | Name one contact for the plumber and collect questions in one reply. |
| Work turns out bigger on the day | Agree that the plumber makes safe, stops and quotes, rather than going over the limit. |
| Two quotes are needed but only one is in | Ask for the second quote at the same time as the first when work may reach $30,000. |
GUIDE
A typical example
This is a generic example, not a real job. A sewer stack in a 20-lot building blocks on a Friday evening and the ground floor shower backs up. The building manager calls it in as a P1. The plumber clears the stack within the strata manager's standing limit, then runs a camera and finds heavy scale and a cracked section on level 2.
On Monday the strata manager receives a report with photos, the CCTV video and a quote with two options: patch the cracked section now, or reline the full stack as a planned job. The committee votes electronically during the week, approves the patch, and asks for the full relining to go into the 10-year plan.
Our free committee approval template sets out a quote in the order a committee reads it. Pair it with a standing limit and most routine jobs are approved the same day.
DOWNLOAD
Committee approval template
Free to download and print: Committee approval template.
QUESTIONS
Questions
SERVICES
How we can help
SOURCES
Sources
Last updated 8 November 2026. General information, not legal advice.
COMMERCIAL & STRATA
Explore Commercial & Strata
Who we help
Services

KNOWLEDGE CENTRE
Need a hand with this?
Log a job, or start with a free health check of your building.
Planning ahead? Request our compliance pack, book a free building health check or invite us to your contractor panel.
Licensed NSW 285594C
24/7 priority response
Report and photos on every job
4.9 from 3,000+ Google reviews