
Sample Condition Report
What our condition and completion reports look like, section by section.
24/7 PRIORITY RESPONSE | WORK ORDERS | COMPLIANCE PACK

NOW SERVICING NORTH SYDNEY
WE ARE AVAILABLE
- NSW Contractor Licence 285594C
- 24/7 Priority Response
- 5,183 Commercial Jobs Since 2019
- Report and Photos on Every Job
- Invoices With Your PO and SP Number
- Onsite in 30 Minutes Guaranteed
THE SHORT ANSWER
In short
Every Building Care visit ends with a condition and completion report: your work order and strata plan numbers, a one-page summary that rates each plumbing asset green, amber or red, findings with photos, recommendations with a priority and a fixed-price quote, and the work done with its compliance certificates. This sample shows the format.
SAMPLE
Sample condition and completion report
Sample report
An illustrative building, not a client’s. The format is the one every Building Care client receives.
ReportPX-SAMPLE-0001
BuildingA 1960s four-storey walk-up, 24 lots, Eastern Suburbs
Date8 November 2026
Work orderWO-12345
Strata planSP 00000
PlumberLicensed plumber, Proximity Plumbing (NSW Contractor Licence 285594C)
Why it’s here: The header carries your work order and strata plan numbers, so the report and invoice match your records and accounts payable can approve them.
Summary
| Asset | Rating | Recommendation | Priority |
|---|---|---|---|
| Main sewer line | Amber | Reline the main line within 12 months. Until then, jet the line every 6 months. | P4 Planned |
| Cast iron stacks | Red | Reline both stacks with no wall demolition. Quote attached. | P3 Standard |
| Central hot water plant | Amber | Replace the relief valve now; budget to replace the plant within 2 to 3 years. | P3 Standard |
| Box gutters and stormwater pits | Green | Clear the rear pit before the storm season. | P4 Planned |
Why it’s here: The summary is the page the committee reads first: every asset, its rating and what to do, on one page.
Main sewer line Amber
What we found: CCTV from the boundary trap: tree roots entering at two clay pipe joints, about 30% of the pipe blocked at 3.8 metres.
Recommendation:Reline the main line within 12 months. Until then, jet the line every 6 months.
Priority: P4 Planned
Why it’s here: Each finding has a rating, what we saw, a photo and a recommendation with a priority. Red items come with a fixed-price quote.

CCTV still from one of our own jobs
Cast iron stacks Red
What we found: Heavy rust and scale inside both stacks, narrowing the pipe. The lower lots report slow drains.
Recommendation: Reline both stacks with no wall demolition. Quote attached.
Priority: P3 Standard

Illustration, not a Proximity job
Central hot water plant Amber
What we found: Unit is nine years old. The relief valve is weeping and the tank shows surface rust at the base.
Recommendation: Replace the relief valve now; budget to replace the plant within 2 to 3 years.
Priority: P3 Standard

Illustration, not a Proximity job
Box gutters and stormwater pits Green
What we found: Box gutter outlets clear. Rear pit has some silt.
Recommendation: Clear the rear pit before the storm season.
Priority: P4 Planned

Illustration, not a Proximity job
Completion and compliance
Work done on this visit: relief valve on the hot water plant replaced and tested; rear stormwater pit cleared. Certificate of Compliance lodged for the regulated work, copy attached.
Next visit: in 6 months, with the backflow device test due in March.
Why it’s here: What we did on the day, the certificates for the building records, and when we are back.
HOW TO READ IT
How to read a Proximity report
| Section | What to look for |
|---|---|
| Header | Your work order and strata plan numbers, the date and the plumber |
| Summary | Red items first: these need a decision now |
| Findings | Photos and plain-English notes for each asset |
| Recommendations | A priority (P1 to P4) and a fixed-price quote for anything urgent |
| Completion | What was done, certificates and the next visit |
WHO USES IT
How each reader uses the report
Committee members
Start with the summary page. Red items need a decision at this meeting; amber items are for the budget; green items need nothing. The photos show owners why the money is needed.
Strata managers
Check the header matches your work order and strata plan numbers, attach the report to the agenda, and approve red quotes within your limit or put them to the committee.
Building managers
Use the findings as your action list: who needs access, which valves or pits are involved, and when we are back. It is also your record that the issue was raised.
Facility managers
File the completion section and certificates for audits, and set reminders for the next backflow test and TMV service from the dates in the report.
WHAT THE RATINGS ASK OF YOU
Red, amber and green: what to do with each
Red: decide now
Red means failed, unsafe or likely to cause damage soon. In the sample, the cast iron stacks are red: rust and scale have narrowed both pipes and the lower lots already have slow drains. Waiting usually means more blockages, more call-outs and a risk of sewage in a lot. Red items come with a fixed-price quote so the decision can be made at once.
Amber: plan and budget
Amber means worn or near the end of its life, but working. The main sewer line and the hot water plant are amber in the sample. They go into the 10-year capital works fund plan with a year to act, and some get an interim step, such as jetting the main line every 6 months until it is relined.
Green: check again next time
Green means good condition. The box gutters are green in the sample, with one pit to clear before the storm season. Green items cost nothing now, but they stay on the list so a change is noticed early.
QUESTIONS TO ASK
Questions to ask about any plumbing report
- Was the camera footage saved, and can we have a copy?
- Is this common property or inside a lot? Who is responsible for it?
- What happens if we wait six months? Twelve months?
- How long will the repair last, and what warranty comes with it?
- Is the quote a fixed price, and what would change it?
- Will the work need a water or drainage shutdown, and for how long?
- Does the work need a certificate of compliance, and will we get a copy?
- Which items should go into our 10-year plan, and in which year?
Any plumber who wrote the report should be able to answer these, including us. If the answers are vague, ask for them in writing before you approve the work.
GLOSSARY
Words you will see in a plumbing report
- CCTV inspection: a waterproof camera pushed through a drain or stack to record its inside on video.
- Stack: the vertical pipe that carries waste from each floor down to the sewer. Older buildings often have cast iron stacks.
- Relining: repairing a pipe from the inside with a resin-soaked liner that sets hard, so walls and floors are not opened.
- Jetting: cleaning a drain with high-pressure water to cut roots and flush silt and fat.
- Relief valve: a safety valve on a hot water heater that releases water if temperature or pressure rises too high.
- Tempering valve or TMV: a valve that mixes hot and cold water so outlets deliver water at a safe temperature.
- Testable backflow device: a valve assembly that stops water from a building flowing back into the mains, tested every year.
- Box gutter: a gutter built into the roof, inside the building line, which overflows indoors when blocked.
- Work order and SP number: your reference for the job and the strata plan number, so the report and invoice match your records.
- P1 to P4: our priority levels, from emergency to planned work. See our service levels.
More terms in our plumbing glossary.
QUESTIONS
Sample report questions
EXPLORE
Building Care
COMMERCIAL & STRATA
Explore Commercial & Strata
Who we help
Services
Building Care

SAMPLE REPORT
Get a report like this for your building
Book the free health check, or log a job if something needs fixing now.
Planning ahead? Request our compliance pack, book a free building health check or invite us to your contractor panel.
Licensed NSW 285594C
24/7 priority response
Report and photos on every job
4.9 from 3,000+ Google reviews

