THE SHORT ANSWER
In short
A 10-Year Plumbing Plan lists every plumbing asset on a building’s common property with its condition, expected life, the year to act and a cost range. It is built from our health check and gives NSW owners corporations real plumbing figures for the 10-year capital works fund plan the strata law requires.
WHY IT MATTERS
Your capital works fund needs real plumbing figures
Every NSW owners corporation must have a 10-year plan for its capital works fund (Strata Schemes Management Act 2015, s 80). Plumbing is one of the hardest parts to forecast: most of it is inside walls and under the ground, and it fails without much warning.
The 10-Year Plumbing Plan turns what we find on the health check into figures the committee can budget for: which assets will need work, roughly when, and roughly what it will cost.
What NSW strata law requires
The capital works fund pays for replacing or repairing common property; day-to-day upkeep comes from the administrative fund (NSW Government). The 10-year plan starts from the first AGM, must be reviewed at least every five years and is considered at each AGM, and changes to it need a vote of the owners.
From 1 April 2026, a new or revised plan must be prepared on the standard form. A scheme with a current plan does not have to switch until it revises it or replaces it after 10 years (strata law changes). The NSW Government recommends a review every year, not just every five, to support better budgeting and levy planning (Capital Works Fund Planner).
For a new building, the first plan must take into account the developer’s initial maintenance schedule, which from 1 April 2026 is also on a standard form. And since 1 July 2025, owners corporations must consider the cost of sustainability infrastructure when they set capital works fund contributions.
WHAT’S IN IT
What the plan covers
| Column | What it tells you |
|---|---|
| Asset | Every plumbing asset on common property: stacks, main lines, hot water plant, pumps, backflow devices, TMVs, pits, gutters, meters and valves |
| Condition | Green, amber or red from the health check, with what we found |
| Expected life | How long the asset or its repair should last |
| Year to act | When to budget for the work |
| Cost range | A range from our own priced jobs, firmed up with a fixed-price quote when the work is due |
EXAMPLE PLAN
What a 10-Year Plumbing Plan looks like
Example: a 1960s four-storey walk-up, 24 lots, Eastern Suburbs. Choose a period to see what falls due and the budget range for it.
| Asset | Condition | Expected life | Year to act | Action | Cost range |
|---|---|---|---|---|---|
| Cast iron sewer stacks (2) | Red Rust and scale inside both stacks on CCTV; blockages in the lower lots. | Relined: 50-year life expectancy | Year 1 | Reline both stacks | $3,875 to $10,505 (per stack) |
| Main sewer line to the boundary | Amber Tree roots at two joints on CCTV. | Relined: 50-year life expectancy | Years 1 to 2 | Reline the main line | $3,875 to $10,505 |
| Central hot water plant | Amber Nine years old; relief valve weeping. | Most systems last about 8 to 10 years | Years 2 to 3 | Replace the plant | $10,000 to $50,000 (central plant) |
| Main water meter and isolation valves | Amber Main valve stiff and will not fully shut. | Replace when it fails to shut | Year 3 | Replace the valves | $385 to $1,375 |
| Gutters and downpipes | Green Sound; minor rust at two joints. | Check every year | Year 5 | Repair rusted joints | $663 to $3,057 |
| Stormwater pits and box gutters | Green Clear; some silt in the rear pit. | Clear every year | Every year | Clear before storm season | $660 to $2,062 (every year) |
| Testable backflow device | Green Passed its last test. | Tested every 12 months (Sydney Water) | Every year | Yearly test and lodgement | In the care plan |
Over 10 years: 5 planned items, about $22,673 to $85,947 including GST, plus the yearly items.
Example plan for an illustrative building, not a client’s. Cost ranges are the middle half of what our priced jobs of that type cost, 2019 to 2026, including GST; central hot water plant is our typical range for that work. Yearly items are listed but not added to the totals. Your plan is priced from your building’s own health check.
READING THE EXAMPLE
How to read the example plan
The two cast iron stacks are red, in year 1. The camera showed rust and scale inside both, and the lower lots already have blockages. Relining each stack, at $3,875 to $10,505 per stack, stops the blockages without opening walls.
The main sewer line is amber, in years 1 to 2. Roots are at two joints but not yet blocking it. Relining it costs $3,875 to $10,505; until then, jetting every 6 months keeps it running.
The hot water plant is amber, in years 2 to 3. It is nine years old, and most systems last about 8 to 10 years. Budgeting $10,000 to $50,000 now avoids a special levy when it fails. The dripping relief valve is a small repair done straight away.
The main valves are amber, in year 3, at $385 to $1,375: they still turn but will not fully shut. The gutters are green, with a small repair pencilled in for year 5 at $663 to $3,057.
The pits and the backflow device are yearly items. They appear in every year but not in the totals: pit clearing at $660 to $2,062 a year, and the backflow test inside a care plan.
WHERE THE FIGURES COME FROM
What plumbing capital works cost in Sydney
The example uses the middle half of all our priced jobs of each type. For commercial and strata buildings on their own, the figures look like this:
- Half of our 35 priced commercial and strata pipe relining jobs since 2019 cost between $4,235 and $11,676, including GST, with a median of $7,150.
- Half of our 121 priced commercial and strata blocked sewer drain jobs since 2019 cost between $715 and $1,815, including GST, with a median of $1,045.
- Half of our 108 priced commercial and strata blocked stormwater jobs since 2019 cost between $746 and $2,221, including GST, with a median of $1,429.
- Half of our 164 priced commercial and strata hot water jobs since 2019 cost between $348 and $2,999, including GST, with a median of $770.
What moves a price: how many metres of pipe and how many junctions, access to the stack or line, whether a pit or wall must be opened, and how many lots lose water or drainage while the work is done. A plan uses ranges; when an item falls due, you get a fixed-price quote before any work starts. More prices on our plumbing prices page and the pipe relining cost guide.
THE STANDARD FORM
Using our plan with the standard form and Strata Hub
The NSW Government’s Capital Works Fund Planner in Strata Hub builds a plan on the standard form (Capital Works Fund Planner). The strata managing agent, chairperson, secretary or strata scheme reporter listed for the scheme can use it. It asks for the fund balance, whether the scheme is registered for GST, unit entitlements and the quarterly levy, then the expected cost of each item and the years it falls due, a contingency and an assumed building cost inflation rate.
Our plan gives you the plumbing lines for that form:
- Each plumbing asset becomes a line, with the year to act from our plan.
- Enter our cost ranges in today’s dollars. They include GST, so check how the scheme’s GST status is set in the planner.
- Let the planner’s inflation rate carry the cost forward, so the figures are not inflated twice.
- Keep yearly items, such as the backflow test and pit clearing, in the administrative fund budget: they are upkeep, not capital works.
- After work is done, tell your strata manager so the line comes out of the plan and the next review starts from the truth.
The NSW Government suggests larger or more complex schemes may want outside specialists such as a quantity surveyor or building consultant. Our plan covers the plumbing only; roofs, lifts, painting and fire services need their own advice.
HOW WE BUILD IT
How we build your plan
1
Health check
Every asset checked, with CCTV on the main lines.
2
Asset register
Each asset listed with its age, condition and location.
3
The plan
Year to act and a cost range for each asset, in a format your strata manager can drop into the capital works forecast.
4
Update every year
On a Care Plan, we update it after each visit so the budget stays current.
COMMON GAPS
Five gaps we see in strata plumbing budgets
- One round figure for “plumbing”, with no assets behind it, so nobody can tell whether it is enough.
- No line for the central hot water plant, even when it is close to the end of its life.
- Stacks and the main sewer line left out because nobody has looked inside them.
- Yearly compliance costs, such as backflow testing, missing from the administrative fund budget.
- A plan never updated after work is done, so finished items stay in and new findings never get in.
Our guide to the 10-year plumbing plan for strata and how old your building’s pipes are go further.
QUESTIONS
10-Year Plan questions
EXPLORE
Building Care
COMMERCIAL & STRATA
Explore Commercial & Strata
Who we help
Services
Building Care

10-YEAR PLAN
Get the figures for your building
Start with a free health check, or log a job if something needs fixing now.