Sizing commercial hot water for cafés, salons, gyms and clinics

Size hot water for your busiest hour, not an average day. How storage and continuous flow compare, and the NSW temperature limits that apply.

24/7 PRIORITY RESPONSE | WORK ORDERS | COMPLIANCE PACK

Google

Overall Rating

4.9

Five stars

(3,000+)

Brightest & Best Business Awards: Winner 2019, Winner 2024, Winner 2025, People's Choice 2025, Finalist 2023

NOW SERVICING NORTH SYDNEY

  • NSW Contractor Licence 285594C
  • 24/7 Priority Response
  • 5,183 Commercial Jobs Since 2019
  • Report and Photos on Every Job
  • Invoices With Your PO and SP Number
  • Onsite in 30 Minutes Guaranteed

KEY TAKEAWAYS

Quick answer

Reviewed by William Demirdonder, licensed plumber, NSW licence 275278C, on 8 November 2026

  • Business owners
  • Facility managers
  • Hot water
  • 6 min read

Quick answer

Size commercial hot water for your busiest hour, not your average day. A plumber works out peak demand from your fixtures and how many run at once, then chooses storage, continuous flow or a mix, with enough recovery to be ready for the next rush. In NSW, water at outlets must be no hotter than 50°C, or 45°C in patient care areas and childcare. A system that runs cold at peak is undersized.

  • Peak demand decides the size: how many outlets run at once, and for how long.
  • Storage suits short heavy peaks; continuous flow suits steady use; many sites use both.
  • NSW delivery limits: 50°C, or 45°C in patient care areas, childcare and similar.
  • Most hot water systems last about 8 to 10 years, so plan the replacement.

GUIDE

Start with your busiest hour

Hot water is sized for the moment it is needed most. A café that is quiet at 3pm but slammed at 7.30am needs a system that copes at 7.30am. A gym with a rush of showers after work needs enough hot water for that rush, and enough recovery to be ready for the next one.

To size it properly, your plumber needs to know:

  • Every outlet that uses hot water: basins, sinks, showers, and any equipment fed from the system.
  • How many are used at the same time at peak, and for how long.
  • Your opening hours, and when the peaks fall.
  • Any plans to grow: more chairs, more showers, longer hours.

GUIDE

How different businesses use hot water

BusinessWhere the hot water goesTypical patternWhat matters most
CaféSinks, hand basins, cleaningMorning rush, then cleaning at closeFast recovery after the rush
SalonBasins for hair washingBack-to-back washes all daySteady temperature at several basins at once
GymShowers and basinsSharp peaks before and after workEnough hot water for many showers at once
ClinicHand basins, cleaningFrequent short use all daySafe, steady temperature at every basin

These are typical patterns, not rules. Two cafés with the same seats can need very different systems.

GUIDE

Storage, continuous flow or both

Storage systems, gas, electric or heat pump, keep a volume of water hot. They handle short, heavy peaks well, but once the stored water is used the system needs time to recover.

Continuous flow heaters heat water as it is used, so they do not run out, but each unit only delivers so much flow at once. Larger sites use banks of several units together.

Combinations are common in commercial work: a bank of continuous flow units with a storage tank, or storage plant with a flow and return loop so hot water reaches far outlets quickly.

The right choice also depends on your gas supply or electrical capacity, space, flues and running costs. Gas work must be done by a licensed gasfitter, who certifies it with Building Commission NSW (NSW Government: gas compliance).

Check the supply before you choose. A bank of continuous flow units can draw far more gas at once than a single storage heater. If your meter or the pipe to the plant room cannot deliver that, the new system will underperform at exactly the busiest time. On Jemena's network, a meter upgrade is requested through Jemena's Gas Portal (Jemena), so allow time for it in the project. Electric and heat pump systems raise the same question about switchboard capacity, which is one for your electrician.

GUIDE

Temperature limits in NSW

The National Construction Code's NSW variation limits heated water at outlets used for personal hygiene to no more than 45°C in health-care patient care areas, aged care residential areas, early childhood centres and school areas used by children, and facilities for people with a disability. Everywhere else the limit is 50°C. The temperature is achieved in line with AS/NZS 3500.4 (ABCB: NCC NSW heated water variation).

That is usually done with tempering valves or thermostatic mixing valves (TMVs) between the heater and the outlets. A clinic's patient areas are likely to need TMVs; ask your plumber to confirm which outlets they serve.

GUIDE

Signs your system is the wrong size

  • Hot water runs out or goes lukewarm at your busiest time.
  • It takes a long time to come back after a rush.
  • Temperature changes at a basin when other outlets are used.
  • Customers or staff wait a long time for hot water at far outlets.
  • Energy bills rise without a change in trade.

Some of these are faults, not size: a failed element or burner, a faulty valve or a stopped circulating pump. Have it checked before you replace anything.

Common sizing mistakes:

  • Sizing on floor area or seat count alone. Two venues of the same size can use hot water very differently. Outlets and peak use are what count.
  • Forgetting recovery. A tank that copes with the morning rush but takes two hours to reheat will fail a second rush at lunch.
  • Ignoring the far outlets. A basin a long pipe run from the heater wastes water and time while it warms up. A flow and return loop, or a second smaller unit closer to it, can fix that.
  • Like-for-like replacement after the business has changed. The old unit was sized for the old fit-out. Add the new basins, showers or machines before choosing.
  • Leaving out equipment. Glass washers, dishwashers and laundry machines may be fed from the hot water system, or have their own heating. Check which.

GUIDE

Replacing or upgrading

Most hot water systems last about 8 to 10 years. Plan the replacement while the old unit still works, so you choose the size and type instead of taking whatever is in stock on the day it fails. Replacing an existing hot water system does not need a Notice of Work, but you still get a Certificate of Compliance for the work (NSW Government).

For budgeting, half of our priced commercial and strata hot water jobs since 2019 cost between $348 and $2,999, including GST, and half of our hot water repairs between $382 and $1,980. Larger plant is quoted after we assess the site.

Ask your plumber

What peak demand did you size this for, how long does it take to recover, and what happens if we add outlets later?

If you are planning a fit-out or a replacement, we can look at your peak use and give you options with a fixed price.

QUESTIONS

Questions

SERVICES

How we can help

SOURCES

Sources

Last updated 8 November 2026. General information, not legal advice.

COMMERCIAL & STRATA

Explore Commercial & Strata

KNOWLEDGE CENTRE

Need a hand with this?

Log a job, or start with a free health check of your building.

Planning ahead? Request our compliance pack, book a free building health check or invite us to your contractor panel.

Licensed NSW 285594C

24/7 priority response

Report and photos on every job

4.9 from 3,000+ Google reviews